Project Completion: Custom Pivot Shaft & Bracket Replacement on Heavy Duty Tipper Lorry

Custom Welding | Fabrication | Welding Design | Welding Fitters
March 3, 2026
More ProjectsGet a quote

We recently carried out an urgent repair on a heavy-duty tipper lorry where the rear pivot shaft and mounting brackets had worn down to a critical level. Unfortunately, the required replacement parts were no longer available from the manufacturer.

Our solution was to design and fabricate a complete new pivot shaft assembly along with reinforced brackets in our workshop. The new components were precision-machined and modified to fit the existing setup perfectly, then professionally installed on site.

The repair has restored smooth, safe operation to the tipper body and significantly extended the working life of the vehicle without the need for costly replacement parts or downtime.

This is a great example of the type of custom steel fabrication and vehicle modification work we carry out regularly for the plant, haulage, and construction sectors.

At JC Welding we offer:

  • Custom pivot shafts and bushes
  • Worn bracket and hinge repairs
  • Heavy vehicle modifications
  • Emergency fabrication when OEM parts are obsolete
  • On-site fitting and welding services

If you have a commercial vehicle, tipper, or piece of plant machinery with worn or unavailable parts, get in touch — we’ll engineer a solution for you.

Some other completed Projects

Recent Project Completion: Substation Vermin Control Sheeting

Recent Project Completion: Substation Vermin Control Sheeting

We’re pleased to announce the successful completion of another important infrastructure project. Our team has installed robust vermin control sheeting beneath several substations. The heavy-gauge steel panels were custom fabricated in our workshop, then carefully...

read more
Project Completion: Boiler Pipework Support Replacement

Project Completion: Boiler Pipework Support Replacement

We recently completed an important repair and upgrade project on a boiler house pipework system where the original mild steel support brackets had corroded badly and failed. The pipework had dropped into the concrete trench, becoming partially buried in hardened waste...