Recent Project Completion: Substation Vermin Control Sheeting

Custom Welding | Welding Design | Welding Fitters
March 18, 2026
More ProjectsGet a quote

We’re pleased to announce the successful completion of another important infrastructure project.

Our team has installed robust vermin control sheeting beneath several substations. The heavy-gauge steel panels were custom fabricated in our workshop, then carefully positioned and secured on support legs directly under the substation structures.

All penetrations for cables have been neatly managed with colour-coded markers (red, yellow, blue) for easy identification and future maintenance. The sheeting has been fully fitted and sealed around the perimeter to create an effective barrier against rodents, birds, and other pests that could otherwise cause serious damage to electrical systems.

This work was completed efficiently and handed over ready for the final groundworks stage.

At JC Welding, we specialise in high-specification steel fabrication for the power and utilities sector, including:

  • Vermin-proof under-sheeting for substations
  • Custom support structures and fixings
  • Protective steelwork for critical infrastructure
  • On-site installation with minimal disruption

Protecting vital electrical assets with precision-engineered steel solutions is what we do best.

If you manage substations, power networks, or critical infrastructure and need reliable vermin control or steel protection systems, contact JC Welding for a competitive quote.

Some other completed Projects

Project Completion: Boiler Pipework Support Replacement

Project Completion: Boiler Pipework Support Replacement

We recently completed an important repair and upgrade project on a boiler house pipework system where the original mild steel support brackets had corroded badly and failed. The pipework had dropped into the concrete trench, becoming partially buried in hardened waste...

read more